Optimizing container movements using one and two automated stacking cranes
From MaRDI portal
Publication:2379774
Recommendations
- Bilevel Optimization of Container Cranes
- Scheduling automated triple cross-over stacking cranes in a container yard
- Routing two stacking cranes with predetermined container sequences
- Optimizing the number of deployed yard cranes in a container terminal
- A note on scheduling container storage operations of two non-passing stacking cranes
- Scheduling co-operating stacking cranes with predetermined container sequences
- An optimisation framework for yard planning in a container terminal: Case with automated rail-mounted gantry cranes
- scientific article; zbMATH DE number 3910251
- Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
Cited in
(18)- A generalized classification scheme for crane scheduling with interference
- Stochastic modeling of unloading and loading operations at a container terminal using automated lifting vehicles
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
- Smart stacking for import containers using customer information at automated container terminals
- Storage yard operations in container terminals: literature overview, trends, and research directions
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
- Advanced methods for container stacking
- Optimizing the landside operation of a container terminal
- Bilevel Optimization of Container Cranes
- Approaches for solving the container stacking problem with route distance minimization and stack rearrangement considerations
- On double cycling for container port productivity improvement
- Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
- Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity
- Yard crane scheduling for container storage, retrieval, and relocation
- Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal
- Scheduling automated triple cross-over stacking cranes in a container yard
- An optimal layout of container yards
This page was built for publication: Optimizing container movements using one and two automated stacking cranes
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2379774)