Scheduling co-operating stacking cranes with predetermined container sequences
From MaRDI portal
Recommendations
- Routing two stacking cranes with predetermined container sequences
- Cooperative twin-crane scheduling
- An exact solution approach for scheduling cooperative gantry cranes
- Scheduling automated triple cross-over stacking cranes in a container yard
- Scheduling cooperative gantry cranes with seaside and landside jobs
Cites work
- A Geometric Model and a Graphical Algorithm for a Sequencing Problem
- An efficient algorithm for the job-shop problem with two jobs
- Container terminal operation and operations research -- a classification and literature review
- Crane scheduling in container yards with inter-crane interference
- Discrete time model and algorithms for container yard crane scheduling
- Operations research at container terminals: a literature update
- Scheduling automated triple cross-over stacking cranes in a container yard
- Scheduling of container storage and retrieval
- Survey of research in the design and control of automated guided vehicle systems
Cited in
(22)- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
- Routing two stacking cranes with predetermined container sequences
- Scheduling cooperative gantry cranes with seaside and landside jobs
- Advanced methods for container stacking
- Interference aware scheduling of triple-crossover-cranes
- Preemptive stacker crane problem: extending tree-based properties and construction heuristics
- Scheduling dedicated jobs with variative processing times
- A stochastic model for the throughput analysis of passing dual yard cranes
- Optimizing container movements using one and two automated stacking cranes
- Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
- Optimizing the landside operation of a container terminal
- Scheduling double-track gantry cranes to minimize the overall loading/unloading time
- A generalized classification scheme for crane scheduling with interference
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- Novel time-space network flow formulation and approximate dynamic programming approach for the crane scheduling in a coil warehouse
- Scheduling automated triple cross-over stacking cranes in a container yard
- A note on scheduling container storage operations of two non-passing stacking cranes
- Cooperative twin-crane scheduling
- Tree based models and algorithms for the preemptive asymmetric stacker crane problem
- An exact solution approach for scheduling cooperative gantry cranes
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals
This page was built for publication: Scheduling co-operating stacking cranes with predetermined container sequences
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q908295)