Scheduling double-track gantry cranes to minimize the overall loading/unloading time
From MaRDI portal
Publication:6542999
Recommendations
- An exact solution approach for scheduling cooperative gantry cranes
- Routing two stacking cranes with predetermined container sequences
- Scheduling cooperative gantry cranes with seaside and landside jobs
- Scheduling co-operating stacking cranes with predetermined container sequences
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals
Cites work
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- A crane scheduling method for port container terminals
- A fast heuristic for quay crane scheduling with interference constraints
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A generalized classification scheme for crane scheduling with interference
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A tabu search heuristic for the quay crane scheduling problem
- Algorithm Theory - SWAT 2004
- An exact solution approach for scheduling cooperative gantry cranes
- Approximate the scheduling of quay cranes with non-crossing constraints
- Crane scheduling with non-crossing constraint
- Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
- Loading, unloading and premarshalling of stacks in storage areas: survey and classification
- Scheduling automated triple cross-over stacking cranes in a container yard
- Scheduling co-operating stacking cranes with predetermined container sequences
- Scheduling cooperative gantry cranes with seaside and landside jobs
- Scheduling small number of quay cranes with non-interference constraint
- Storage yard operations in container terminals: literature overview, trends, and research directions
- Transshipment of containers at a container terminal: An overview
This page was built for publication: Scheduling double-track gantry cranes to minimize the overall loading/unloading time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6542999)