Real-time scheduling for twin RMGs in an automated container yard
From MaRDI portal
Publication:989643
DOI10.1007/S00291-010-0209-0zbMATH Open1200.90085OpenAlexW2123874439MaRDI QIDQ989643FDOQ989643
Seung Min Ok, Kwang Ryel Ryu, Taejin Park, Ri Choe
Publication date: 23 August 2010
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-010-0209-0
Recommendations
- Integrated scheduling of handling equipment at automated container terminals
- Yard crane scheduling in the ground trolley-based automated container terminal
- Scheduling automated triple cross-over stacking cranes in a container yard
- Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
- A cooperative approach to dispatching and scheduling twin-yard cranes in container terminals
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
- A complete and an incomplete algorithm for automated guided vehicle scheduling in container terminals
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals
- Integrated scheduling of quay cranes and automated lifting vehicles in automated container terminal with unlimited buffer space
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Container terminal operation and operations research -- a classification and literature review
- Operations research at container terminals: a literature update
- A beam search algorithm for the load sequencing of outbound containers in port container terminals
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
- Crane scheduling in container yards with inter-crane interference
- Yard crane scheduling in port container terminals
- Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals
- An optimal routing algorithm for a transfer crane in port container terminals
Cited In (5)
- Yard crane scheduling for container storage, retrieval, and relocation
- Models and algorithms for a yard crane scheduling problem in container ports
- Cooperative twin-crane scheduling
- Storage yard operations in container terminals: literature overview, trends, and research directions
- A generalized classification scheme for crane scheduling with interference
This page was built for publication: Real-time scheduling for twin RMGs in an automated container yard
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q989643)