Scheduling automated triple cross-over stacking cranes in a container yard
From MaRDI portal
Publication:989636
DOI10.1007/s00291-010-0206-3zbMath1200.90072OpenAlexW2026204646MaRDI QIDQ989636
Frank Schneider, Ulrich Dorndorf
Publication date: 23 August 2010
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-010-0206-3
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Related Items (16)
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area ⋮ A stochastic model for the throughput analysis of passing dual yard cranes ⋮ Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers ⋮ Interference aware scheduling of triple-crossover-cranes ⋮ Models and algorithms for a yard crane scheduling problem in container ports ⋮ A generalized classification scheme for crane scheduling with interference ⋮ Scheduling co-operating stacking cranes with predetermined container sequences ⋮ A mathematical formulation and complexity considerations for the blocks relocation problem ⋮ An integrated model for the transshipment yard scheduling problem ⋮ Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals ⋮ Scheduling cooperative gantry cranes with seaside and landside jobs ⋮ An exact solution approach for scheduling cooperative gantry cranes ⋮ Storage yard operations in container terminals: literature overview, trends, and research directions ⋮ An exact method for scheduling a yard crane ⋮ A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals ⋮ Routing two stacking cranes with predetermined container sequences
Uses Software
Cites Work
- Crane scheduling in container yards with inter-crane interference
- Operations research at container terminals: a literature update
- Optimizing the landside operation of a container terminal
- Yard crane scheduling in port container terminals
- An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
This page was built for publication: Scheduling automated triple cross-over stacking cranes in a container yard