Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
From MaRDI portal
Publication:4411212
Recommendations
- A multiple-crane-constrained scheduling problem in a container terminal
- Port space allocation with a time dimension
- An exact method for scheduling a yard crane
- A tabu search heuristic for the inland container transportation problem
- Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals
Cited in
(22)- Discrete time model and algorithms for container yard crane scheduling
- A beam search algorithm for the load sequencing of outbound containers in port container terminals
- On combinatorial optimization and mechanism design problems arising at container ports. With a foreword by Prof. Dr. Erwin Pesch
- Reformulated acyclic partitioning for rail-rail containers transshipment
- A crane scheduling method for port container terminals
- An exact method for scheduling a yard crane
- Transport operations in container terminals: literature overview, trends, research directions and classification scheme
- Vehicle Routing Problems and Container Terminal Operations – An Update of Research
- The loader problem: formulation, complexity and algorithms
- Single Straddle Carrier Routing Problem in Port Container Terminals: Mathematical Model and Solving Approaches
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- Transportation problem with nonlinear side constraints a branch and bound approach
- scientific article; zbMATH DE number 6177873 (Why is no real title available?)
- Yard crane scheduling in the ground trolley-based automated container terminal
- Models and algorithms for a yard crane scheduling problem in container ports
- Iterated greedy for the yard crane scheduling problem with input/output assignment
- Solving the yard crane scheduling problem with dynamic assignment of input/output points
- Yard crane scheduling for container storage, retrieval, and relocation
- Vehicle routing concepts in the closed-loop container network of ARN -- a case study
- An optimisation framework for yard planning in a container terminal: Case with automated rail-mounted gantry cranes
- Scheduling automated triple cross-over stacking cranes in a container yard
- Real-time scheduling for twin RMGs in an automated container yard
This page was built for publication: Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations