Iterated greedy for the yard crane scheduling problem with input/output assignment
From MaRDI portal
Cites work
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- A stochastic model for the throughput analysis of passing dual yard cranes
- A study on the use of non-parametric tests for analyzing the evolutionary algorithms' behaviour: a case study on the CEC'2005 special session on real parameter optimization
- An exact method for scheduling a yard crane
- An optimal routing algorithm for a transfer crane in port container terminals
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
- Constraint programming models for integrated container terminal operations
- Discrete time model and algorithms for container yard crane scheduling
- scientific article; zbMATH DE number 3231692 (Why is no real title available?)
- Iterated greedy local search methods for unrelated parallel machine scheduling
- Scheduling automated triple cross-over stacking cranes in a container yard
- Scheduling of container storage and retrieval
- Solving the yard crane scheduling problem with dynamic assignment of input/output points
- Yard crane scheduling for container storage, retrieval, and relocation
- Yard crane scheduling in port container terminals
- Yard crane scheduling in the ground trolley-based automated container terminal
Cited in
(2)
This page was built for publication: Iterated greedy for the yard crane scheduling problem with input/output assignment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6891813)