Modeling and solving rich quay crane scheduling problems

From MaRDI portal
Publication:1761126


DOI10.1016/j.cor.2011.09.025zbMath1251.90163MaRDI QIDQ1761126

Frank Meisel, Roberto Trunfio, Pasquale Legato

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.09.025


90B35: Deterministic scheduling theory in operations research


Related Items

Some complexity results and an efficient algorithm for quay crane scheduling problem, Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity, Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model, A follow-up survey of berth allocation and quay crane scheduling problems in container terminals, Scheduling multiple factory cranes on a common track, A reclaimer scheduling problem arising in coal stockyard management, A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints, A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules, Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level, A generalized classification scheme for crane scheduling with interference, Scheduling reclaimers serving a stock pad at a coal terminal, Scheduling quay cranes and yard trucks for unloading operations in container ports, The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion, An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability, Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel, An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem, Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading, Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles, Double girder bridge crane with double cycling: scheduling strategy and performance evaluation, An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes



Cites Work