Crane scheduling with spatial constraints

From MaRDI portal
Publication:3156730

DOI10.1002/nav.10123zbMath1054.90036OpenAlexW2055959567MaRDI QIDQ3156730

Andrew E. B. Lim, Fei Xiao, Brian Rodrigues, Yi Zhu

Publication date: 11 January 2005

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.10123




Related Items (29)

A Benders decomposition-based framework for solving quay crane scheduling problemsA tabu search heuristic for the quay crane scheduling problemScheduling cranes at an indented berthOptimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminalsCompact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problemsA heuristic for the quay crane scheduling problem based on contiguous bay crane operationsA branch-and-cut algorithm for factory crane scheduling problemMIP approaches for the integrated berth allocation and quay crane assignment and scheduling problemA generalized classification scheme for crane scheduling with interferenceHandling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision modelScheduling quay cranes and yard trucks for unloading operations in container portsThe quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approachVehicle Routing Problems and Container Terminal Operations – An Update of ResearchApproximate the scheduling of quay cranes with non-crossing constraintsOn-line scheduling with non-crossing constraintsThe study of the unidirectional quay crane scheduling problem: complexity and risk-aversionOperations research at container terminals: a literature updateAn effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problemImproved tabu search heuristics for the dynamic space allocation problemModeling and solving rich quay crane scheduling problemsA fast heuristic for quay crane scheduling with interference constraintsSimulation-based optimization for discharge/loading operations at a maritime container terminalModelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminalsModeling and solution of the joint quay crane and truck scheduling problemMultiple crane scheduling in a batch annealing process with no-delay constraints for machine unloadingA local branching-based algorithm for the quay crane scheduling problem under unidirectional schedulesAN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEMA survey of berth allocation and quay crane scheduling problems in container terminalsDouble girder bridge crane with double cycling: scheduling strategy and performance evaluation


Uses Software


Cites Work




This page was built for publication: Crane scheduling with spatial constraints