Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
From MaRDI portal
Publication:2184047
DOI10.1016/j.ejor.2020.02.021zbMath1443.90191OpenAlexW3005680372MaRDI QIDQ2184047
Yuquan Du, Mei Sha, Jiang Hang Chen, Tianbao Qin
Publication date: 27 May 2020
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.02.021
mixed integer programmingconstraint programmingcontainer terminalOR in maritime industrycontainer unloading/loading problem
Related Items (4)
Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals ⋮ Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers ⋮ The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions ⋮ Constraint programming and local search heuristic: a matheuristic approach for routing and scheduling feeder vessels in multi-terminal ports
Uses Software
Cites Work
- Transport operations in container terminals: literature overview, trends, research directions and classification scheme
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A tabu search heuristic for the quay crane scheduling problem
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Integrating simulation and optimization to schedule loading operations in container terminals
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Container terminal operation and operations research -- a classification and literature review
- A generalized classification scheme for crane scheduling with interference
- Scheduling quay cranes and yard trucks for unloading operations in container ports
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
- Modeling and solving rich quay crane scheduling problems
- A crane scheduling method for port container terminals
- Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
- Storage yard operations in container terminals: literature overview, trends, and research directions
- A fast heuristic for quay crane scheduling with interference constraints
- The hybrid flow shop scheduling problem
- Modeling and solution of the joint quay crane and truck scheduling problem
- The quay crane scheduling problem with time windows
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Crane scheduling with non-crossing constraint
- A m‐parallel crane scheduling problem with a non‐crossing constraint
This page was built for publication: Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel