Modeling and solving rich quay crane scheduling problems
From MaRDI portal
Recommendations
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- The quay crane scheduling problem with time windows
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level
- Scheduling quay cranes and yard trucks for unloading operations in container ports
Cites work
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- A crane scheduling method for port container terminals
- A fast heuristic for quay crane scheduling with interference constraints
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A tabu search heuristic for the quay crane scheduling problem
- Container terminal operation and operations research -- a classification and literature review
- Crane scheduling with non-crossing constraint
- Crane scheduling with spatial constraints
- Duality-Based Algorithms for Scheduling Unrelated Parallel Machines
- Exact and approximation algorithms for makespan minimization on unrelated parallel machines
- scientific article; zbMATH DE number 1646978 (Why is no real title available?)
- Operations research at container terminals: a literature update
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Simulation-based optimization for discharge/loading operations at a maritime container terminal
- The quay crane scheduling problem with time windows
Cited in
(25)- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level
- A generalized classification scheme for crane scheduling with interference
- Scheduling reclaimers serving a stock pad at a coal terminal
- Scheduling quay cranes and yard trucks for unloading operations in container ports
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
- Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
- Modeling and solution of the joint quay crane and truck scheduling problem
- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Scheduling cranes at an indented berth
- Scheduling multiple factory cranes on a common track
- A reclaimer scheduling problem arising in coal stockyard management
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints
- Some complexity results and an efficient algorithm for quay crane scheduling problem
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems
- Coordinated scheduling optimization of quay cranes and AGVs in automated container terminals
- Advances in multi-crane scheduling: extended non-interference modeling and temporal-constraint-based valid inequalities
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
This page was built for publication: Modeling and solving rich quay crane scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761126)