Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions
From MaRDI portal
Recommendations
- A solution for cyclic scheduling of multi-hoists without overlapping
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- Robust optimization for the cyclic hoist scheduling problem
- An efficient new heuristic for the hoist scheduling problem
- An algorithm for hoist scheduling problems
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows
Cited in
(16)- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- On-line scheduling in a surface treatment system
- Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants
- A solution for cyclic scheduling of multi-hoists without overlapping
- Cyclic hoist scheduling in large real-life electroplating lines
- Robust optimization for the cyclic hoist scheduling problem
- Scheduling multiple factory cranes on a common track
- An algorithm for hoist scheduling problems
- scientific article; zbMATH DE number 1437392 (Why is no real title available?)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- Scheduling robotic cells with fixed processing times or time windows: classification, solution approaches, polynomial algorithms and complexity
- A faster polynomial algorithm for 2-cyclic robotic scheduling
- An evolutionary approach for the design and scheduling of electroplating facilities
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm
This page was built for publication: Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4380546)