Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line

From MaRDI portal
Publication:4252102
Jump to:navigation, search

DOI10.1080/002075497194804zbMATH Open0934.90030OpenAlexW2125814918MaRDI QIDQ4252102FDOQ4252102


Authors:


Publication date: 14 November 1999

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/002075497194804




Recommendations

  • ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
  • An efficient new heuristic for the hoist scheduling problem
  • scientific article; zbMATH DE number 1437392
  • Optimal design of production lines


zbMATH Keywords

productivityphysical layoutsaturated single-hoist production linestreatment line


Mathematics Subject Classification ID

Production models (90B30)



Cited In (3)

  • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
  • An evolutionary approach for the design and scheduling of electroplating facilities
  • An efficient new heuristic for the hoist scheduling problem





This page was built for publication: The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4252102)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4252102&oldid=18146012"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 6 February 2024, at 16:32. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki