ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
From MaRDI portal
Publication:4367074
Recommendations
- Separate and carousel type allocations of workers in a U-shaped production line
- Bounds and approximations for cycle times of a \(U\)-shaped production line
- Worker allocation in lean U-shaped production lines
- The stochastic U-line balancing problem
- Reversibility and dependence in a U-shaped production line
Cited in
(16)- Bounds and approximations for cycle times of a \(U\)-shaped production line
- Separate and carousel type allocations of workers in a U-shaped production line
- Reversibility and dependence in a U-shaped production line
- Analysis of the effect of the line-\textit{seru} conversion on the waiting time with batch arrival
- A shortest route formulation of simple U-type assembly line balancing problem
- Evaluation of mixed-model U-line operational designs
- Meeting demand variation using flexible U-shaped assembly lines
- Uniform workload assignments for assembly line by GA-based amelioration approach
- Worker allocation in lean U-shaped production lines
- Design and control of agile automated CONWIP production lines
- The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line
- scientific article; zbMATH DE number 1349174 (Why is no real title available?)
- The stochastic U-line balancing problem
- The effect of breakdowns on U-shaped production lines
- A goal programming approach to simple U-line balancing problem
- A network model for parallel line balancing problem
This page was built for publication: ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4367074)