Analysis of the effect of the line-\textit{seru} conversion on the waiting time with batch arrival
Summary: The conveyor assembly line has been widely used in manufacturing industries to produce standard products with low costs. However, due to lack of flexibility, this production method has not been conducive to multivariety and small-batch production. In this situation, \textit{seru} production formed by converting conveyor assembly lines has been a successful innovation in the Japanese manufacturing industry. Most of the existing literature has studied the benefits of this line-\textit{seru} conversion from the perspective of the enterprises themselves, but this paper studies the effect of the line-\textit{seru} conversion on the waiting time from the perspective of the customer. First, the change in the average waiting queue length caused by the line-\textit{seru} conversion is proposed as an evaluation index. Second, with the consideration of the practical situation of random batch arrivals, the average waiting queue length formulas for the conveyor assembly line and \textit{seru} production are established based on the assumption that the arrival is a Poisson process. Then, under two scenarios, we investigate the relationship between the average waiting queue length changed by the line-\textit{seru} conversion and other parameters and find that the conversion can reduce the average waiting queue length in multivariety and small-batch production. Finally, under other potential scenarios, the equations for determining the average waiting queue length resulting from a change to line-\textit{seru} conversion are derived.
- Formulations, features of solution space, and algorithms for line-pure \textit{seru} system conversion
- Mathematical analysis and solutions for multi-objective line-cell conversion problem
- Sequential arrays of waiting lines
- Queueing-model based analysis of assembly lines with finite buffers and general service times
- ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
- A batch arrival $M^X/M/c$ queue with impatient customers
- An implementation framework for seru production
- Analysis of an M/G/ queue with batch arrivals and batch-dedicated servers.
- Computational analysis of single-server bulk-arrival queues \(M^ X/G/1\)
- scientific article; zbMATH DE number 3174015 (Why is no real title available?)
- Mathematical analysis and solutions for multi-objective line-cell conversion problem
- Modeling and numerical analysis of line-cell conversion problems
- Taxonomy of batch queueing models in manufacturing systems
- The queueing system MX/G/1 and its ramifications
- Formulations, features of solution space, and algorithms for line-pure \textit{seru} system conversion
- Logic-based Benders decomposition method for the \textit{seru} scheduling problem with sequence-dependent setup time and DeJong's learning effect
- An integrated simulation-data envelopment analysis approach for impact of line-seru conversion
- Lagrangian relaxation for seru scheduling problem with a time-dependent learning effect
- A branch-and-price-and-cut algorithm for divisional seru formation and scheduling problem considering Section construction
- A unified robust stochastic programming approach for integrated production and distribution scheduling problem for seru production system under uncertainty
This page was built for publication: Analysis of the effect of the line-\textit{seru} conversion on the waiting time with batch arrival
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2298379)