Batch scheduling in process industries: An application of resource-constrained project scheduling
From MaRDI portal
Recommendations
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
- A heuristic method for large-scale batch scheduling in the process industries
- scientific article; zbMATH DE number 2159149
- Advanced production scheduling for batch plants in process industries
Cited in
(32)- Modelling setup times, process batches and transfer batches using activity network logic
- Using constraint programming for solving RCPSP/MAX-cal
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
- Advanced production scheduling for batch plants in process industries
- An integrated system solution for supply chain optimization in the chemical process industry
- Solving the weighted capacitated planned maintenance problem and its variants
- Resource-constrained project scheduling with activity splitting and setup times
- On the integration of diverging material flows into resource-constrained project scheduling
- Minimizing makespan on a single machine with release dates and inventory constraints
- A local search framework for industrial test laboratory scheduling
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
- Managing and modelling general resource transfers in (multi-)project scheduling
- A complex time based construction heuristic for batch scheduling problems in the chemical industry
- A flow-based tabu search algorithm for the RCPSP with transfer times
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- A heuristic method for large-scale batch scheduling in the process industries
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)
- Exact algorithms for inventory constrained scheduling on a single machine
- Batching-based approaches for optimized packing of jobs in the spatial scheduling problem
- Job scheduling with technical constraints
- scientific article; zbMATH DE number 2154254 (Why is no real title available?)
- scientific article; zbMATH DE number 2154255 (Why is no real title available?)
- scientific article; zbMATH DE number 2159149 (Why is no real title available?)
- Scheduling the production of rolling ingots: industrial context, model, and solution method
- Local search approaches for the test laboratory scheduling problem with variable task grouping
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Scheduling projects with converging and diverging material flows using IBM ILOG CP optimizer -- an experimental performance analysis
- Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling
- Fifty years of research on resource-constrained project scheduling explored from different perspectives
- Approximation algorithms for inventory constrained scheduling on a single machine
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Complexity of single machine scheduling subject to nonnegative inventory constraints
This page was built for publication: Batch scheduling in process industries: An application of resource-constrained project scheduling