Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
The paper surveys results on deterministic resource-constrained project scheduling problems with general temporal constraints and different regular and nonregular objective functions. After presenting a basic formulation of the problem (incorporating renewable resources and minimal and maximal time-lags between the activities), structural questions of feasible schedules are investigated. Based on these structures, different exact and heuristic algorithms are discussed. Afterwards extensions of the basic model are presented (calendarization, storage resources, sequence-dependent changeover times, non-renewable resources and multi-mode activities). Finally, it is shown how the considered models can be applied in make-to-order production, batch scheduling in process industries and investment projects.
- Resource-constrained project scheduling with time windows
- An efficient time-windowing procedure for scheduling projects under multiple resource constraints
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- scientific article; zbMATH DE number 1264426
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling under limited resources. Models, methods, and applications
- A constraint-based method for project scheduling with time windows
- Project scheduling with time windows. From theory to applications.
- Minimizing total weighted late work in the resource-constrained project scheduling problem
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Optimization of a recursive conveyor by reduction to a constraint satisfaction problem
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)
- A metaheuristic solution approach for the time-constrained project scheduling problem
- Resource loading with time windows
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Resource-constrained project scheduling with time windows
- scientific article; zbMATH DE number 2013754 (Why is no real title available?)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- Time-constrained project scheduling
- A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags
- Scheduling tests in automotive R\&D projects
- A survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications