Critical Path Analyses Via Chance Constrained and Stochastic Programming

From MaRDI portal
Publication:5329503

DOI10.1287/opre.12.3.460zbMath0125.09602OpenAlexW2138566894MaRDI QIDQ5329503

Gerald L. Thompson, A. Charnes, William W. Cooper

Publication date: 1964

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.12.3.460



Related Items

A joint chance-constrained programming model with row dependence, Risk taking in stochastic PERT networks, A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing, Project scheduling problem with mixed uncertainty of randomness and fuzziness, Computing project makespan distributions: Markovian PERT networks revisited, Longest path analysis in networks of queues: dynamic scheduling problems, Modelling complex assemblies as a queueing network for lead time control, An optimization model for stochastic project networks with cash flows, An approach to pert: application of dirichlet distribution, Evolutionary algorithms for multi-objective stochastic resource availability cost problem, Solving project scheduling problem with the philosophy of fuzzy random programming, Nota sobre programacion lineal estocastica: Evolucion y estado actual. (I), Least possible time paths in stochastic, time-varying networks., A new probabilistic approach to the path criticality in stochastic PERT, Almost sure critical paths, Lower bound for the mean project completion time in dynamic PERT networks, A heuristic procedure for solving the dynamic probabilistic project expediting problem, Time-cost trade-off via optimal control theory in Markov PERT networks, A master surgical scheduling approach for cyclic scheduling in operating room departments, Fuzzy project scheduling problem and its hybrid intelligent algorithm, Chance-constrained programming in activity networks: A critical evaluation, A multi-objective resource allocation problem in PERT networks, On stochastic linear programming. The Laplace transform to the distribution of the optimum and applications, Contributions of Professor William W. Cooper in operations research and management science, Evaluating project completion time in project networks with discrete random activity durations, Estimating the distribution function of a transformed random vector, Due date assignment for multistage assembly systems, The chance constrained critical path with location-scale distributions, The bias of an estimate of coupled slack in stochastic PERT networks, Project scheduling problem with stochastic activity duration times, Improving project cost estimation by taking into account managerial flexibility