Fuzzy project scheduling problem and its hybrid intelligent algorithm
From MaRDI portal
Publication:967803
DOI10.1016/j.apm.2009.04.011zbMath1185.90080OpenAlexW2093393826MaRDI QIDQ967803
Publication date: 2 May 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2009.04.011
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items
Project scheduling problem with mixed uncertainty of randomness and fuzziness ⋮ Solving project scheduling problem with the philosophy of fuzzy random programming ⋮ \(\Gamma\)-robust optimization of project scheduling problems ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources ⋮ Optimizing the joint replenishment and delivery scheduling problem under fuzzy environment using inverse weight fuzzy nonlinear programming method ⋮ A fuzzy time-dependent project scheduling problem ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure ⋮ New fuzzy models for time-cost trade-off problem ⋮ Stochastic project scheduling with hierarchical alternatives ⋮ Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks ⋮ Using greedy clustering method to solve capacitated location-routing problem with fuzzy demands
Cites Work
- Unnamed Item
- Unnamed Item
- Depedent-chance programming: A class of stochastic optimization
- The use of fuzzy variables in PERT
- Using fuzzy set theory in a scheduling problem: A case study
- Chance constrained programming with fuzzy parameters
- Minimax chance constrained programming models for fuzzy decision systems
- Theory and practice of uncertain programming
- Uncertainty theory. An introduction to its axiomatic foundations.
- The project scheduling problem with irregular starting time costs
- Project scheduling problem with stochastic activity duration times
- Chance-Constrained Programming
- Critical-Path Planning and Scheduling: Mathematical Basis
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Another Look at the PERT Assumptions
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Network planning with stochastic activity durations, an evaluation of PERT
- On the Expected Duration of PERT Type Networks
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints
This page was built for publication: Fuzzy project scheduling problem and its hybrid intelligent algorithm