Using fuzzy set theory in a scheduling problem: A case study

From MaRDI portal
Publication:1256391

DOI10.1016/0165-0114(79)90022-8zbMath0403.90036OpenAlexW2078830462MaRDI QIDQ1256391

Henri Prade

Publication date: 1979

Published in: Fuzzy Sets and Systems (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0165-0114(79)90022-8




Related Items

Project scheduling problem with mixed uncertainty of randomness and fuzzinessParallel machine scheduling models with fuzzy processing timesDeveloping a heuristic algorithm for order production planning using network models under uncertainty conditionsChance-constrained model for uncertain job shop scheduling problemApplication of fuzzy distributions on project managementEvolutionary tabu search for flexible due-date satisfaction in fuzzy job shop schedulingSolving project scheduling problem with the philosophy of fuzzy random programmingFUN: a dynamic method for scheduling problemsA heuristic method for RCPSP with fuzzy activity timesOptimization with uncertainties: a scheduling exampleProject scheduling problem with fuzzy activity durations: a novel operational law based solution frameworkCriticality analysis of activity networks under interval uncertaintyA fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectJob sequencing with fuzzy processing timesGeneralized path-finding algorithms on semirings and the fuzzy shortest path problem.Fuzzy project scheduling problem and its hybrid intelligent algorithmA cooperative co-evolutionary particle swarm optimiser based on a niche sharing scheme for the flow shop scheduling problem under uncertaintyNew fuzzy models for time-cost trade-off problemOn computing the latest starting times and floats of activities in a network with imprecise durationsA path enumeration approach for the analysis of critical activities in fuzzy networksCritical path analysis in the network with fuzzy activity timesOn the latest starting times and criticality of activities in a network with imprecise durationsThe computational complexity of the criticality problems in a network with interval activity timesMaximum and minimum between fuzzy symbols in non-interactive and weakly non-interactive situationsSurvey on fuzzy shop schedulingA New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project NetworkParallel Tabu Search Algorithm with Uncertain Data for the Flexible Job Shop ProblemBi-level multiple mode resource-constrained project scheduling problems under hybrid uncertaintyScheduling arrivals to a production system in a fuzzy environmentA fuzzy-linguistic approach to a multi-criteria sequencing problemComputing latest starting times of activities in interval-valued networks with minimal time lagsUsing fuzzy sets in operational researchFuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledgeFuzzy temporal characteristics of operations for project management on the network models basisOn latest starting times and floats in activity networks with ill-known durations



Cites Work