On computing the latest starting times and floats of activities in a network with imprecise durations
From MaRDI portal
Publication:1770714
DOI10.1016/j.fss.2004.08.007zbMath1079.90069OpenAlexW2019561606MaRDI QIDQ1770714
Publication date: 7 April 2005
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.fss.2004.08.007
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (12)
Analysis of critical paths in a project network with fuzzy activity times ⋮ Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks ⋮ Time-cost trade-off analysis of project networks in fuzzy environments ⋮ Criticality analysis of activity networks under interval uncertainty ⋮ Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection ⋮ Solution of interval PERT/CPM network problems by a simplified tabular method ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network ⋮ A simple approach to fuzzy critical path analysis in project networks ⋮ Minmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weights ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags
Cites Work
- Unnamed Item
- Unnamed Item
- Approximate solution of NP optimization problems
- Project network analysis with fuzzy activity times
- Fuzzy sets and systems. Theory and applications
- The use of fuzzy variables in PERT
- Using fuzzy set theory in a scheduling problem: A case study
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- On latest starting times and floats in activity networks with ill-known durations
- On the hardness of evaluating criticality of activities in a planar network with duration intervals
- Fuzzy-Network Planning - FNET
- Critical path analysis in the network with fuzzy activity times
- The computational complexity of the criticality problems in a network with interval activity times
This page was built for publication: On computing the latest starting times and floats of activities in a network with imprecise durations