On the latest starting times and criticality of activities in a network with imprecise durations
From MaRDI portal
Publication:988966
DOI10.1016/j.apm.2009.10.017zbMath1193.90118OpenAlexW2089568180MaRDI QIDQ988966
Siamak Haji Yakhchali, Seyed Hassan Ghodsipour
Publication date: 27 August 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2009.10.017
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items
An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network ⋮ Stochastic project scheduling with hierarchical alternatives
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Erratum to ``On computing the latest starting times and floats of activities in a network with imprecise durations [Fuzzy sets and systems 150 (2005) 53-76]
- A multi-objective wholesaler-retailers inventory-distribution model with controllable lead-time based on probabilistic fuzzy set and triangular fuzzy number
- Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory
- Applying fuzzy method for measuring criticality in project network
- On the latest starting times and criticality of activities in a network with imprecise durations
- A simple approach to fuzzy critical path analysis in project networks
- Computing latest starting times of activities in interval-valued networks with minimal time lags
- Project network analysis with fuzzy activity times
- Fuzzy sets and systems. Theory and applications
- The use of fuzzy variables in PERT
- Fuzzy sets as a basis for a theory of possibility
- Using fuzzy set theory in a scheduling problem: A case study
- PSPLIB -- a project scheduling problem library
- On computing the latest starting times and floats of activities in a network with imprecise durations
- Project scheduling under uncertainty: survey and research potentials
- Stochastic and fuzzy PERT
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- On latest starting times and floats in activity networks with ill-known durations
- On the hardness of evaluating criticality of activities in a planar network with duration intervals
- Analysis of critical paths in a project network with fuzzy activity times
- Fuzzy-Network Planning - FNET
- Complexity of the minimum-dummy-activities problem in a pert network
- Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment
- Interval Analysis in Scheduling
- Bounding the Project Completion Time Distribution in PERT Networks
- Application of a Technique for Research and Development Program Evaluation
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Critical path analysis in the network with fuzzy activity times
- The computational complexity of the criticality problems in a network with interval activity times