A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network
From MaRDI portal
Publication:725826
DOI10.1007/s40314-017-0434-0zbMath1397.90194OpenAlexW2596688742MaRDI QIDQ725826
Publication date: 2 August 2018
Published in: Computational and Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40314-017-0434-0
triangular fuzzy numbersFPERTfuzzy critical pathfuzzy earliest and latest timesnode-weighted rooted tree
Deterministic scheduling theory in operations research (90B35) Deterministic network models in operations research (90B10)
Cites Work
- Unnamed Item
- Applying fuzzy method for measuring criticality in project network
- On the latest starting times and criticality of activities in a network with imprecise durations
- Computing latest starting times of activities in interval-valued networks with minimal time lags
- Comparison of fuzzy numbers based on the probability measure of fuzzy events
- On a canonical representation of fuzzy numbers
- Fuzzy temporal characteristics of operations for project management on the network models basis
- On latest starting times and floats in activity networks with ill-known durations
- Selecting IS personnel use fuzzy GDSS based on metric distance method
- Using metric distance ranking method to find intuitionistic fuzzy critical path
- Fuzzy sets