Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems

From MaRDI portal
Publication:5689382

DOI10.1287/mnsc.41.10.1693zbMath0870.90070OpenAlexW2131167412MaRDI QIDQ5689382

Rainer Kolisch, Arno Sprecher, Andreas Drexl

Publication date: 15 September 1997

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://semanticscholar.org/paper/1e0335200d7e9a242b4726e3a1594aa4b26f69df




Related Items (only showing first 100 items - show all)

A metaheuristic solution approach for the time-constrained project scheduling problemManaging and modelling general resource transfers in (multi-)project schedulingOptimization Strategies for Resource-Constrained Project Scheduling Problems in Underground MiningA solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter searchOn the integration of diverging material flows into resource-constrained project schedulingGoing to the core of hard resource-constrained project scheduling instancesAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesNew summary measures and datasets for the multi-project scheduling problemAn integrated dynamic facility layout and job shop scheduling problem: a hybrid NSGA-II and local search algorithmInvestigating a claim about resource complexity measureMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicRobust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity durationAn Improved Genetic Algorithm for the Resource-Constrained Project Scheduling ProblemA classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problemTabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertaintyA branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraintsContinuous-time formulations for multi-mode project schedulingTabu search for proactive project scheduling problem with flexible resourcesA Boolean satisfiability approach to the resource-constrained project scheduling problemAn empirical analysis of a set of hybrid heuristics for the solution of the resource leveling problemUnnamed ItemProperties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingThe multi-mode resource investment problem: a benchmark library and a computational study of lower and upper boundsNew representation to reduce the search space for the resource-constrained project scheduling problemA hybrid genetic algorithm for the resource-constrained project scheduling problemSetting gates for activities in the stochastic project scheduling problem through the cross entropy methodologyAn evaluation of the adequacy of project network generators with systematically sampled networksTabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup timesA combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problemsCase-based reasoning and improved adaptive search for project schedulingAn approximate dynamic programming approach to project scheduling with uncertain resource availabilitiesResource constrained project scheduling subject to due dates: preemption permitted with penaltySetting gates for activities in the stochastic project scheduling problem through the cross entropy methodologyAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesPre-emption in resource-constrained project schedulingGRASP and path relinking for project scheduling under partially renewable resourcesFirst Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project StructureA branch-and-cut algorithm for scheduling of projects with variable-intensity activitiesAn application of randomized minimum cut to the project time/cost tradeoff problemA scatter search algorithm for project scheduling under partially renewable resourcesScenario-based approach for flexible resource loading under uncertaintyBenders decomposition, Lagrangean relaxation and metaheuristic designA survey of hybrid metaheuristics for the resource-constrained project scheduling problemPolyhedral Reformulation of a Scheduling Problem And Related Theoretical ResultsA high-performance exact method for the resource-constrained project scheduling problemAn iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problemA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingPrice of anarchy and price of stability in multi-agent project schedulingClient‐contractor bargaining on net present value in project scheduling with limited resourcesProject selection, scheduling and resource allocation with time dependent returnsAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsScatter search for project scheduling with resource availability costEnvironmental regulation in project-based industriesEvolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-artA Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling ProblemExact and flexible solution approach to a critical chain project management problemOn the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relationsA rough-cut capacity planning model with overlappingA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsWhen it is worthwhile to work with the stochastic RCPSP?A two-stage stochastic programming approach for project planning with uncertain activity durationsThe discrete time/cost trade-off problem: Extensions and heuristic proceduresTime-constrained project schedulingAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemMIP models for resource-constrained project scheduling with flexible resource profilesScheduling resource-constrained projects with a flexible project structurePractical solutions for a dock assignment problem with trailer transportationA reduction tree approach for the discrete time/cost trade-off problemIntegration of electromagnetism with multi-objective evolutionary algorithms for RCPSPA partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemExperimental investigation of heuristics for resource-constrained project scheduling: an updateSimulation of stochastic demand data streams for network revenue management problemsPriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA genetic algorithm for resource investment problem with discounted cash flowsAn exact algorithm for project scheduling with multiple modesA genetic algorithm for resource investment project scheduling problem, tardiness permitted with penaltyOptimizing the supply chain configuration for make-to-order manufacturingActivity nets: A guided tour through some recent developmentsApplying local rescheduling in response to schedule disruptionsProject scheduling with finite or infinite number of activity processing modes -- a surveyNew concepts for activity float in resource-constrained project managementInsertion techniques for static and dynamic resource-constrained project scheduling.A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.Resource-constrained project scheduling: A critical activity reordering heuristicUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemOptimal workforce assignment to operations of a paced assembly lineA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingMulti-mode resource-constrained project scheduling using RCPSP and SAT solversResource-constrained project scheduling: A survey of recent developments.An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relationsProject scheduling with flexible resources: formulation and inequalitiesSimplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithmA modified PSO algorithm for minimizing the total costs of resources in MRCPSPA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsPredetermined intervals for start times of activities in the stochastic project scheduling problemA biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions considerationA mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags




This page was built for publication: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems