Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology
From MaRDI portal
Publication:5894527
DOI10.1007/s10479-011-0940-1zbMath1233.90179OpenAlexW4240091475MaRDI QIDQ5894527
Publication date: 8 March 2012
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-011-0940-1
Related Items (2)
Planning of complex supply chains: a performance comparison of three meta-heuristic algorithms ⋮ Appointment scheduling with a quantile objective
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The cross-entropy method for continuous multi-extremal optimization
- Scheduling projects with stochastic activity duration to maximize expected net present value
- Project network models with discounted cash flows a guided tour through recent developments
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Project scheduling under uncertainty: survey and research potentials
- Application of the cross-entropy method to the buffer allocation problem in a simulation-based environment
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
- Activity Delay in Stochastic Project Networks
- Application of a Technique for Research and Development Program Evaluation
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology