Project scheduling. A research handbook.

From MaRDI portal
Publication:1422056

zbMath1059.90068MaRDI QIDQ1422056

Willy S. Herroelen, Erik L. Demeulemeester

Publication date: 17 February 2004

Published in: International Series in Operations Research \& Management Science (Search for Journal in Brave)




Related Items (only showing first 100 items - show all)

Managing and modelling general resource transfers in (multi-)project schedulingSolving multi-mode time–cost–quality trade-off problems under generalized precedence relationsOptimal crashing of an activity network with disruptionsIntegration of equipment planning and project schedulingComparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing RatesEvolutionary algorithms for multi-objective stochastic resource availability cost problemGoing to the core of hard resource-constrained project scheduling instancesScheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion timeProject scheduling and equipment planning with random breakdownsAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesDynamic order acceptance and capacity planning on a single bottleneck resourceModeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparisonResource leveling in projects with flexible structuresProject scheduling problem with fuzzy activity durations: a novel operational law based solution frameworkEvaluation of the quantiles and superquantiles of the makespan in interval valued activity networksA linear time-cost tradeoff problem with multiple milestones under a comb graphA Boolean satisfiability approach to the resource-constrained project scheduling problemAn empirical analysis of a set of hybrid heuristics for the solution of the resource leveling problemAmbiguous Joint Chance Constraints Under Mean and Dispersion InformationScheduling trainees at a hospital department using a branch-and-price approachMulti-coloring and job-scheduling with assignment and incompatibility costsConsidering project management activities for engineering design groupsA hybrid genetic algorithm for the resource-constrained project scheduling problemLagrangian bounds for just-in-time job-shop schedulingSetting gates for activities in the stochastic project scheduling problem through the cross entropy methodologyTabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup timesThe bilevel optimisation of a multi-agent project scheduling and staffing problemMaximizing the expected net present value in a project with uncertain cash flowsDiscrete-continuous project scheduling with discounted cash flows - a tabu search approachAn approximate dynamic programming approach to project scheduling with uncertain resource availabilitiesReduction method based on a new fuzzy rough set in fuzzy information system and its applications to scheduling problemsSetting gates for activities in the stochastic project scheduling problem through the cross entropy methodologyAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesA hybrid differential evolution algorithm with column generation for resource constrained job schedulingPre-emption in resource-constrained project schedulingGRASP and path relinking for project scheduling under partially renewable resourcesA branch-and-cut algorithm for scheduling of projects with variable-intensity activitiesA scatter search algorithm for project scheduling under partially renewable resourcesNash equilibria for the multi-agent project scheduling problem with controllable processing timesA survey of hybrid metaheuristics for the resource-constrained project scheduling problemNash equilibrium solutions in multi-agent project scheduling with milestonesSolving a tropical optimization problem with application to optimal schedulingExtremal properties of tropical eigenvalues and solutions to tropical optimization problemsPrice of anarchy and price of stability in multi-agent project schedulingProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingWork Package Sizing and Project PerformanceParallel execution of schedules with random dependency graphProject scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilitiesStrong bounds for resource constrained project scheduling: preprocessing and cutting planesAdjacent-Resource SchedulingImproved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lagMinimizing the expected makespan of a project with stochastic activity durations under resource constraintsMinimizing maximum lateness in two-stage projects by tropical optimizationNew strategies for stochastic resource-constrained project schedulingA flow-based tabu search algorithm for the RCPSP with transfer timesA genetic algorithm for the robust resource leveling problemA classification of predictive-reactive project scheduling proceduresProactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilitiesA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsComplexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobsA float-path theory and its application to the time-cost tradeoff problemAn integer programming approach to the multimode resource-constrained multiproject scheduling problemA continuous time-cost tradeoff problem with multiple milestones and completely ordered jobsSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingScheduling resource-constrained projects with a flexible project structureAn approach using SAT solvers for the RCPSP with logical constraintsBi-objective resource-constrained project scheduling with robustness and makespan criteriaSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationExperimental investigation of heuristics for resource-constrained project scheduling: an updateModeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfersAn adaptive crashing policy for stochastic time-cost tradeoff problemsMultiobjective project portfolio selection with fuzzy constraintsA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesMathematical programming and financial objectives for scheduling projectsA multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problemMixed-integer linear programming for resource leveling problemsOptimizing the supply chain configuration for make-to-order manufacturingMulti-resource allocation in stochastic project schedulingThe total adjustment cost problem: applications, models, and solution algorithmsA preemptive bound for the resource constrained project scheduling problemProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmProject scheduling with finite or infinite number of activity processing modes -- a surveyNew concepts for activity float in resource-constrained project managementResource constraint scheduling with a fractional shared resourceDecentralised scheduling with confidentiality protectionResource constrained routing and scheduling: review and research prospectsResource leveling in a machine environmentA branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurementMulti-mode resource-constrained project scheduling using RCPSP and SAT solversSimplifying the nonlinear continuous time-cost tradeoff problemTropical optimization problems with application to project scheduling with minimum makespanHeuristics for a project management problem with incompatibility and assignment costsRobust execution strategies for project scheduling with unreliable resources and stochastic durationsTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresAn exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relationsModelling and solving grid resource allocation problem with network resources for workflow applicationsA modified PSO algorithm for minimizing the total costs of resources in MRCPSPDismantling of nuclear power plants at optimal NPVTime slack-based techniques for robust project scheduling subject to resource uncertainty




This page was built for publication: Project scheduling. A research handbook.