Publication | Date of Publication | Type |
---|
Capacity and surgery partitioning: an approach for improving surgery scheduling in the inpatient surgical department | 2023-11-15 | Paper |
Tabu search for proactive project scheduling problem with flexible resources | 2023-07-04 | Paper |
Unrelated parallel machine scheduling with multiple time windows: an application to Earth observation satellite scheduling | 2022-12-19 | Paper |
Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty | 2022-06-22 | Paper |
The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times | 2021-04-20 | Paper |
The proactive and reactive resource-constrained project scheduling problem | 2020-01-03 | Paper |
Robust resource-constrained max-NPV project scheduling with stochastic activity duration | 2019-03-20 | Paper |
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem | 2019-03-06 | Paper |
Literature review on multi-appointment scheduling problems in hospitals | 2018-10-30 | Paper |
A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance | 2018-07-25 | Paper |
Efficient priority rules for the stochastic resource-constrained project scheduling problem | 2018-07-25 | Paper |
A model enhancement approach for optimizing the integrated shift scheduling and vehicle routing problem in waste collection | 2018-05-30 | Paper |
A pure proactive scheduling algorithm for multiple Earth observation satellites under uncertainties of clouds | 2016-11-17 | Paper |
Scheduling operating rooms: achievements, challenges and pitfalls | 2016-11-16 | Paper |
Integrated staffing and scheduling for an aircraft line maintenance problem | 2016-11-14 | Paper |
A multilevel integrative approach to hospital case mix and capacity planning | 2016-11-10 | Paper |
Determining the timing of project control points using a facility location model and simulation | 2016-11-10 | Paper |
Workforce planning incorporating skills: state of the art | 2016-10-06 | Paper |
A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints | 2016-10-06 | Paper |
Exact algorithms for single-machine scheduling with time windows and precedence constraints | 2016-09-08 | Paper |
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations | 2016-09-07 | Paper |
A genetic algorithm for the robust resource leveling problem | 2016-05-13 | Paper |
A sequential procurement model for a PPP project pipeline | 2016-05-04 | Paper |
A new approach for quantitative risk analysis | 2014-09-26 | Paper |
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment | 2014-09-26 | Paper |
Personnel scheduling: a literature review | 2014-07-27 | Paper |
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints | 2012-02-19 | Paper |
Time slack-based techniques for robust project scheduling subject to resource uncertainty | 2011-11-17 | Paper |
Proactive policies for the stochastic resource-constrained project scheduling problem | 2011-08-10 | Paper |
Reactive scheduling in the multi-mode RCPSP | 2010-10-15 | Paper |
Operating room planning and scheduling: a literature review | 2009-11-17 | Paper |
A decision support system for cyclic master surgery scheduling with multiple objectives | 2009-09-25 | Paper |
A classification of predictive-reactive project scheduling procedures | 2009-08-28 | Paper |
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities | 2009-08-28 | Paper |
Sequencing surgical cases in a day-care environment: an exact branch-and-price approach | 2009-04-03 | Paper |
A branch-and-price approach for integrating nurse and surgery scheduling | 2008-04-24 | Paper |
Proactive heuristic procedures for robust project scheduling: An experimental analysis | 2008-04-24 | Paper |
On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem | 2008-01-25 | Paper |
Rangen: A random network generator for activity-on-the-node networks | 2007-12-20 | Paper |
https://portal.mardi4nfdi.de/entity/Q3426427 | 2007-03-09 | Paper |
Building cyclic master surgery schedules with leveled resulting bed occupancy | 2006-11-15 | Paper |
Scheduling trainees at a hospital department using a branch-and-price approach | 2006-10-25 | Paper |
Maximizing the net present value of a project with linear time-dependent cash flows | 2005-05-31 | Paper |
Discrete time/cost trade-offs in project scheduling with time-switch constraints | 2005-03-14 | Paper |
New computational results on the discrete time/cost trade-off problem in project networks | 2005-01-19 | Paper |
Project scheduling. A research handbook. | 2004-02-17 | Paper |
Resource-constrained project scheduling: A survey of recent developments. | 2003-09-07 | Paper |
Progress payments in project scheduling problems. | 2003-06-18 | Paper |
An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem | 2001-10-31 | Paper |
Local search methods for the discrete time/resource trade-off problem in project networks | 1999-11-02 | Paper |
https://portal.mardi4nfdi.de/entity/Q4233362 | 1999-08-19 | Paper |
An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem | 1999-07-21 | Paper |
New Benchmark Results for the Resource-Constrained Project Scheduling Problem | 1999-06-23 | Paper |
Project management and scheduling | 1999-06-09 | Paper |
Project network models with discounted cash flows a guided tour through recent developments | 1999-04-22 | Paper |
Optimal procedures for the discrete time/cost trade-off problem in project networks | 1998-11-29 | Paper |
Modelling setup times, process batches and transfer batches using activity network logic | 1998-11-29 | Paper |
A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem | 1998-07-08 | Paper |
Minimizing Resource Availability Costs in Time-Limited Project Networks | 1997-01-06 | Paper |
On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem | 1994-10-17 | Paper |
A Random Activity Network Generator | 1994-04-06 | Paper |
A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem | 1993-04-01 | Paper |