Determining the timing of project control points using a facility location model and simulation
From MaRDI portal
Publication:337592
DOI10.1016/j.cor.2015.03.006zbMath1348.90363OpenAlexW1985834126MaRDI QIDQ337592
Narjes Sabeghi, Hasan Taheri, Erik L. Demeulemeester, Hamed Reza Tareghian
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/493780
Management decision making, including multiple objectives (90B50) Discrete location and assignment (90B80)
Related Items
Using the generalized maximum covering location model to control a project's progress ⋮ The impact of a limited budget on the corrective action taking process ⋮ Using earned value management and schedule risk analysis with resource constraints for project control ⋮ Formulation and solution of an optimal control problem for industrial project control
Uses Software
Cites Work
- Unnamed Item
- Reactive scheduling in the multi-mode RCPSP
- A classification of predictive-reactive project scheduling procedures
- PSPLIB -- a project scheduling problem library
- On criticality and sensitivity in activity networks
- Optimal timing of project control points
- Project scheduling under uncertainty: survey and research potentials
- Developing activity duration specification limits for effective project control
- Localizing 2‐medians on probabilistic and deterministic tree networks
- Disruption management for resource-constrained project scheduling
- Timing control points via simulation for production systems under random disturbances