Determining the timing of project control points using a facility location model and simulation
From MaRDI portal
(Redirected from Publication:337592)
Recommendations
- Optimal timing of project control points
- On-line control model for network construction projects
- Formulation and solution of an optimal control problem for industrial project control
- On-line Control Model for Cost-simulation Network Projects
- Developing activity duration specification limits for effective project control
Cites work
- scientific article; zbMATH DE number 1488569 (Why is no real title available?)
- A classification of predictive-reactive project scheduling procedures
- Developing activity duration specification limits for effective project control
- Disruption management for resource-constrained project scheduling
- Localizing 2‐medians on probabilistic and deterministic tree networks
- On criticality and sensitivity in activity networks
- Optimal timing of project control points
- PSPLIB -- a project scheduling problem library
- Project scheduling under uncertainty: survey and research potentials
- Reactive scheduling in the multi-mode RCPSP
- Timing control points via simulation for production systems under random disturbances
Cited in
(6)- Using the generalized maximum covering location model to control a project's progress
- Using earned value management and schedule risk analysis with resource constraints for project control
- The impact of a limited budget on the corrective action taking process
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
- Optimal timing of project control points
- Formulation and solution of an optimal control problem for industrial project control
This page was built for publication: Determining the timing of project control points using a facility location model and simulation