Disruption management for resource-constrained project scheduling
From MaRDI portal
Publication:4679782
Recommendations
- Project scheduling under the threat of catastrophic disruption
- Resource constrained project scheduling models under random disturbances
- Scheduling of resource-constrained projects
- scientific article; zbMATH DE number 1728543
- Resource allocation for robust project scheduling
- Scheduling resource-constrained projects with a flexible project structure
- A resources scheduling decision support system for concurrent project management
Cited in
(21)- Using the generalized maximum covering location model to control a project's progress
- Disruption management in production planning
- Proactive policies for the stochastic resource-constrained project scheduling problem
- On prediction and control of discrete-time first-order linear stochastic systems with prospective strong intervention
- Mapping distinctive competencies: a systemic approach
- A classification of predictive-reactive project scheduling procedures
- Two machine scheduling under disruptions with transportation considerations
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Replanning working time under annualised working hours
- Distributed supply-chain project rescheduling: part II—distributed affected operations rescheduling algorithm
- Reactive scheduling in the multi-mode RCPSP
- Maximising the weighted number of activity execution modes in project planning
- The interaction between critical chain sequencing, buffer sizing, and reactive actions in a CC/BM framework
- Applying local rescheduling in response to schedule disruptions
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Determining the timing of project control points using a facility location model and simulation
- Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
- Optimal crashing of an activity network with disruptions
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
This page was built for publication: Disruption management for resource-constrained project scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4679782)