Publication | Date of Publication | Type |
---|
Appointment scheduling at a multidisciplinary outpatient clinic using stochastic programming | 2023-10-17 | Paper |
Strategic interactions between liquefied natural gas and domestic gas markets: a bilevel model | 2022-06-22 | Paper |
A column generation-based algorithm for midterm nurse scheduling with specialized constraints, preference considerations, and overtime | 2022-03-09 | Paper |
The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers | 2020-04-22 | Paper |
A stochastic optimization approach to shift scheduling with breaks adjustments | 2019-04-18 | Paper |
Bounded flexibility in days-on and days-off scheduling | 2019-03-26 | Paper |
An exact algorithm for designing optimal districts in the collection of waste electric and electronic equipment through an improved reformulation | 2019-02-25 | Paper |
Large-scale pickup and delivery work area design | 2016-11-11 | Paper |
Benders decomposition and an IP-based heuristic for selecting IMRT treatment beam angles | 2016-10-07 | Paper |
Flexible weekly tour scheduling for postal service workers using a branch and price | 2014-08-18 | Paper |
A sequential GRASP for the therapist routing and scheduling problem | 2014-08-18 | Paper |
A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines | 2013-08-08 | Paper |
A GRASP with adaptive large neighborhood search for pickup and delivery problems with transshipment | 2012-11-15 | Paper |
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem | 2012-06-18 | Paper |
A GRASP for Parallel Machine Scheduling with Time Windows | 2012-06-08 | Paper |
A reactive GRASP with path relinking for capacitated clustering | 2011-05-11 | Paper |
A branch-and-price algorithm for an integrated production and inventory routing problem | 2010-09-07 | Paper |
Validating vehicle routing zone construction using Monte Carlo simulation | 2010-06-11 | Paper |
The integrated production-inventory-distribution-routing problem | 2010-03-08 | Paper |
A two-stage stochastic programming approach for project planning with uncertain activity durations | 2009-08-28 | Paper |
Class Scheduling for Pilot Training | 2009-07-10 | Paper |
Weekly staff scheduling with workstation group restrictions | 2008-03-20 | Paper |
Workforce planning at USPS mail processing and distribution centers using stochastic optimization | 2008-01-25 | Paper |
A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs | 2008-01-21 | Paper |
Cyclic preference scheduling for nurses using branch and price | 2008-01-16 | Paper |
The task assignment problem for unrestricted movement between workstation groups | 2007-05-15 | Paper |
Cyclic preference scheduling of nurses using a Lagrangian-based heuristic | 2007-05-15 | Paper |
A branch-and-price algorithm for parallel machine scheduling with time windows and job priorities | 2007-02-20 | Paper |
Generating labor requirements and rosters for mail handlers using simulation and optimization | 2006-05-16 | Paper |
A multi-period machine assignment problem | 2005-11-16 | Paper |
Comparative approaches to equipment scheduling in high volume factories | 2005-09-28 | Paper |
Preference scheduling for nurses using column generation | 2005-09-02 | Paper |
Disruption management for resource-constrained project scheduling | 2005-06-21 | Paper |
Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system | 2005-04-04 | Paper |
The flow shop scheduling polyhedron with setup times | 2004-01-06 | Paper |
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. | 2003-09-07 | Paper |
A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows | 2003-06-29 | Paper |
Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework | 2003-06-29 | Paper |
Staff scheduling at the United States postal Service | 2003-05-14 | Paper |
Single machine scheduling with assignable due dates | 2002-08-29 | Paper |
Bundle trust-region algorithm for bilinear bilevel programming | 2002-08-12 | Paper |
A Decomposition Approach to the Inventory Routing Problem with Satellite Facilities | 2002-04-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q2712290 | 2001-05-06 | Paper |
Heuristics for the flow line problem with setup costs | 2000-11-27 | Paper |
A bilevel programming approach to determining tax credits for biofuel production | 2000-09-14 | Paper |
An optimization approach to capacity expansion in semiconductor manufacturing facilities | 2000-08-21 | Paper |
An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times | 1999-12-20 | Paper |
Practical bilevel optimization. Algorithms and applications | 1999-10-10 | Paper |
https://portal.mardi4nfdi.de/entity/Q4247072 | 1999-06-16 | Paper |
The use of upstream and downstream information in scheduling semiconductor batch operations | 1999-05-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q4394595 | 1998-10-01 | Paper |
A GRASP for aircraft routing in response to groundings and delays | 1998-05-25 | Paper |
An analysis of a rail car unloading area for a consumer products manufacturer | 1997-11-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q4332850 | 1997-02-16 | Paper |
A GRASP for the Vehicle Routing Problem with Time Windows | 1995-10-09 | Paper |
Facility-Wide Planning and Scheduling of Printed Wiring Board Assembly | 1995-09-25 | Paper |
Solving Large-Scale Tour Scheduling Problems | 1995-03-16 | Paper |
Equipment Selection and Machine Scheduling in General Mail Facilities | 1995-01-15 | Paper |
Single machine scheduling with flow time and earliness penalties | 1993-10-13 | Paper |
A GRASP for a difficult single machine scheduling problem | 1992-06-28 | Paper |
An algorithm for the mixed-integer nonlinear bilevel programming problem | 1992-06-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q3989989 | 1992-06-28 | Paper |
An analytic framework for sequencing mixed model assembly lines | 1992-06-28 | Paper |
Some properties of the bilevel programming problem | 1991-01-01 | Paper |
Designing Telecommunications Networks for the Reseller Market | 1991-01-01 | Paper |
Arc Reduction and Path Preference in Stochastic Acyclic Networks | 1991-01-01 | Paper |
A decomposition technique for discrete time optimal control problems with an application to water resources management | 1990-01-01 | Paper |
Time-axis decomposition of large-scale optimal control problems | 1990-01-01 | Paper |
A Branch and Bound Algorithm for the Bilevel Programming Problem | 1990-01-01 | Paper |
The Mixed Integer Linear Bilevel Programming Problem | 1990-01-01 | Paper |
Probabilistic shortest path problems with budgetary constraints | 1989-01-01 | Paper |
Note—Operations Sequencing in Discrete Parts Manufacturing | 1989-01-01 | Paper |
Convex two-level optimization | 1988-01-01 | Paper |
Short-Term Scheduling of Thermal-Electric Generators Using Lagrangian Relaxation | 1988-01-01 | Paper |
Developing Competitive Strategies for Buyer-Supplier Negotiations | 1987-01-01 | Paper |
Geometric and algorithmic developments for a hierarchical planning problem | 1985-01-01 | Paper |
Objective function bounds for the inexact linear programming problem with generalized cost coefficients | 1985-01-01 | Paper |
Inexact linear programming with generalized technological matrix sets | 1984-01-01 | Paper |
Optimality conditions for the bilevel programming problem | 1984-01-01 | Paper |
An investigation of the linear three level programming problem | 1984-01-01 | Paper |
An Efficient Point Algorithm for a Linear Two-Stage Optimization Problem | 1983-01-01 | Paper |
An Algorithm for Solving the General Bilevel Programming Problem | 1983-01-01 | Paper |
Computing equilibria via nonconvex programming | 1980-01-01 | Paper |