A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines
From MaRDI portal
(Redirected from Publication:2393485)
Recommendations
- Concurrent operations assignment and sequencing for particular assembly problems in flow lines
- GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- A feasible schedule for parallel assembly tasks in flexible manufacturing systems
- Simultaneous versus sequential loading and scheduling of flexible assembly systems
- Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
- Balancing and sequencing of parallel mixed-model assembly lines
- Sequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithms
- A new approach for mixed-model assembly line sequencing
- An integrated approach for a new flexible multi-product disassembly line balancing problem
Cites work
- scientific article; zbMATH DE number 1820655 (Why is no real title available?)
- A Branch-and-Cut Algorithm for the Undirected Traveling Purchaser Problem
- A GRASP for a difficult single machine scheduling problem
- A GRASP for the biquadratic assignment problem
- A multi-objective model for environmental investment decision making
- A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
- A survey of scheduling problems with setup times or costs
- An analysis of a rail car unloading area for a consumer products manufacturer
- An annotated bibliography of GRASP – Part I: Algorithms
- An annotated bibliography of GRASP-Part II: Applications
- Assignment and sequencing models for the scheduling of process systems
- Greedy randomized adaptive search procedures
- State-of-the-art review: a user's guide to the brave new world of designing simulation experiments
Cited in
(3)- A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
- Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry
- GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line
This page was built for publication: A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2393485)