The interaction between critical chain sequencing, buffer sizing, and reactive actions in a CC/BM framework
DOI10.1142/S0217595919500106zbMATH Open1457.90069OpenAlexW2947678904WikidataQ127810986 ScholiaQ127810986MaRDI QIDQ5223040FDOQ5223040
Authors: Xuejun Hu, Jianjiang Wang, Kaijun Leng
Publication date: 5 July 2019
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595919500106
Recommendations
- A critical chain method project scheduling based model and its GA solution
- An investigation of buffer sizing techniques in critical chain scheduling
- Exact and flexible solution approach to a critical chain project management problem
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- Generalization of the critical chain method supporting the management of projects with a high degree of uncertainty and imperfect information
robustnessbuffer managementreactive schedulingcontrol actionscritical chain sequencingproject planning and control
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Cites Work
- PSPLIB -- a project scheduling problem library
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Proactive policies for the stochastic resource-constrained project scheduling problem
- Rangen: A random network generator for activity-on-the-node networks
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- Minimizing makespan in permutation flow shop scheduling with proportional deterioration
- Disruption management for resource-constrained project scheduling
- A heuristic search algorithm for solving resource-constrained project scheduling problems
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
- Proactive-reactive project scheduling trade-offs and procedures
- An investigation of buffer sizing techniques in critical chain scheduling
- Resource constrained multi-project scheduling problem with resource transfer times
- Managing Underperformance Risk in Project Portfolio Selection
- Some Scheduling Problems on a Single Machine with General Job Effects of Position-Dependent Learning and Start-Time-Dependent Deterioration
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates
- An Auction Approach for Cost and Schedule Management of IT Outsourcing Project
Cited In (2)
Uses Software
This page was built for publication: The interaction between critical chain sequencing, buffer sizing, and reactive actions in a CC/BM framework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5223040)