A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
From MaRDI portal
Publication:852940
DOI10.1016/j.ejor.2005.09.018zbMath1103.90047OpenAlexW2022770422MaRDI QIDQ852940
N. S. Lahiji, Fariborz Jolai, Masoud Rabbani, Seyyed Mohammad Taghi Fatemi Ghomi
Publication date: 15 November 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.09.018
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35)
Related Items (4)
A heuristic approach for resource constrained project scheduling with uncertain activity durations ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework ⋮ Structured construction and simulation of nondeterministic stochastic activity networks
Cites Work
- Unnamed Item
- Unnamed Item
- Stochastic PERT networks as models of cognition: Derivation of the mean, variance, and distribution of reaction time using order-of-processing (OP) diagrams
- Approximating the distribution functions in stochastic networks
- Stochastic scheduling problems I — General strategies
- Determining the K Most Critical Paths in PERT Networks
- Stochastic scheduling problems II-set strategies-
- Approximating the Criticality Indices of the Activities in PERT Networks
- On the Distribution of Activity Time in PERT
- A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
- Practical Use of Distributions in Network Analysis
- Criticality in Stochastic Networks
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
- Application of a Technique for Research and Development Program Evaluation
- Expected Critical Path Lengths in PERT Networks
- On the Expected Duration of PERT Type Networks
This page was built for publication: A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept