Developing activity duration specification limits for effective project control
From MaRDI portal
Publication:2503086
DOI10.1016/j.ejor.2005.03.017zbMath1103.90347OpenAlexW2017188524MaRDI QIDQ2503086
Publication date: 13 September 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.017
Management decision making, including multiple objectives (90B50) Deterministic network models in operations research (90B10)
Related Items (6)
Determining the timing of project control points using a facility location model and simulation ⋮ A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames ⋮ The impact of a limited budget on the corrective action taking process ⋮ Using earned value management and schedule risk analysis with resource constraints for project control ⋮ A nearest neighbour extension to project duration forecasting with artificial intelligence ⋮ A buffer control method for top-down project control
Cites Work
- Unnamed Item
- On criticality and sensitivity in activity networks
- The construction of stable project baseline schedules
- Criticality in Stochastic Networks
- A Comparison Of Variance Reducing Techniques In Pert Simulations
- An uncertainty importance measure of activities in PERT networks
- Sensitivity curves for effective project management
- Application of a Technique for Research and Development Program Evaluation
- Due date-based metrics for activity importance in stochastic activity networks
This page was built for publication: Developing activity duration specification limits for effective project control