On-line Control Model for Cost-simulation Network Projects
From MaRDI portal
Recommendations
- On-line control model for network construction projects
- Generalized stochastic network models for the management of complex projects
- Time-cost trade-off via optimal control theory in Markov PERT networks
- Maximin dynamical probabilistic model of design control
- Harmonization simulation model for managing several stochastic projects
Cited in
(9)- Controlled alternative activity networks for project management
- Timing control points via simulation for production systems under random disturbances
- Harmonization simulation model for managing several stochastic projects
- An intranet-based cost control system
- Three-parametrical harmonization model in project management by means of simulation
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Optimal timing of project control points
- Determining the timing of project control points using a facility location model and simulation
- A dynamic model for managing overlapped iterative product development
This page was built for publication: On-line Control Model for Cost-simulation Network Projects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4887786)