On-line Control Model for Cost-simulation Network Projects
From MaRDI portal
DOI10.1057/JORS.1996.24zbMATH Open0851.90042OpenAlexW2026698676MaRDI QIDQ4887786FDOQ4887786
Authors: Dimitri Golenko-Ginzburg, Aharon Gonik
Publication date: 25 November 1996
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.24
Recommendations
- On-line control model for network construction projects
- Generalized stochastic network models for the management of complex projects
- Time-cost trade-off via optimal control theory in Markov PERT networks
- Maximin dynamical probabilistic model of design control
- Harmonization simulation model for managing several stochastic projects
chance constraintactivity networkon-line controlstochastic projectbudget reassignmenthierarchical control model
Cited In (9)
- An intranet-based cost control system
- Harmonization simulation model for managing several stochastic projects
- Three-parametrical harmonization model in project management by means of simulation
- Controlled alternative activity networks for project management
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Determining the timing of project control points using a facility location model and simulation
- Timing control points via simulation for production systems under random disturbances
- Optimal timing of project control points
- A dynamic model for managing overlapped iterative product development
This page was built for publication: On-line Control Model for Cost-simulation Network Projects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4887786)