Workforce planning incorporating skills: state of the art

From MaRDI portal
Publication:319002

DOI10.1016/j.ejor.2014.10.038zbMath1346.90470OpenAlexW3123266901MaRDI QIDQ319002

Philippe De Bruecker, Jeroen Beliën, Jorne Van den Bergh, Erik L. Demeulemeester

Publication date: 6 October 2016

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://lirias.kuleuven.be/handle/123456789/478202




Related Items (36)

A workforce planning and allocation model for the outbound baggage loading area at Santiago International AirportA bi-objective home care scheduling problem: analyzing the trade-off between costs and client inconvenienceCalibrating cross-training to meet demand mix variation and employee absenceA branch-and-price algorithm for stable workforce assignments with hierarchical skillsSustainable operationsMulti-period technician scheduling with experience-based service times and stochastic customersBalancing stochastic parallel assembly linesA decomposition-based heuristic for large employee scheduling problems with inter-department transfersRetail store operations: literature review and research directionsState of the art in Physician schedulingBinary driver-customer familiarity in service routingA two-stage stochastic programming approach for multi-activity tour schedulingCombining an LNS-based approach and organizational mining for the resource replacement problemOn the complexity of efficient multi-skilled team compositionA classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problemOptimal workforce assignment to operations of a paced assembly lineTabu search for proactive project scheduling problem with flexible resourcesDecision support for the technician routing and scheduling problemCompetence-based estimation of activity duration in IT projectsA worker constrained flexible job shop scheduling problem with sequence-dependent setup timesPatient scheduling in hemodialysis serviceStaff assignment with lexicographically ordered acceptance levelsMinimizing the number of workers in a paced mixed-model assembly lineBi-objective approaches for home healthcare medical team planning and scheduling problemToward an integrated workforce planning framework using structured equationsStrategic workforce planning in healthcare: a multi-methodology approachEmployee substitutability as a tool to improve the robustness in personnel schedulingEmbedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case studyA column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharingThe informational value of employee online reviewsA three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenanceA combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictionsPiecewise linear model for multiskilled workforce scheduling problems considering learning effect and project qualityA sorting based efficient heuristic for pooled repair shop designsA two-stage solution approach for personalized multi-department multi-day shift schedulingSolving the general employee scheduling problem


Uses Software


Cites Work


This page was built for publication: Workforce planning incorporating skills: state of the art