A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
From MaRDI portal
Publication:309061
DOI10.1007/s10951-015-0423-3zbMath1347.90045OpenAlexW2077371113MaRDI QIDQ309061
Patricio Lamas, Erik L. Demeulemeester
Publication date: 7 September 2016
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/486716
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (11)
A genetic algorithm for the robust resource leveling problem ⋮ Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty ⋮ Optimal crashing of an activity network with disruptions ⋮ A compact reformulation of the two-stage robust resource-constrained project scheduling problem ⋮ Project scheduling cost optimization based on resource transfer costs and robustness ⋮ Tabu search for proactive project scheduling problem with flexible resources ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ Stochastic task networks -- trading performance for stability ⋮ The proactive and reactive resource-constrained project scheduling problem ⋮ A robust optimization approach for the multi-mode resource-constrained project scheduling problem ⋮ Stochastic project scheduling with hierarchical alternatives
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- Event-based MILP models for resource-constrained project scheduling problems
- An integer programming approach for linear programs with probabilistic constraints
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements
- Scheduling subject to resource constraints: Classification and complexity
- PSPLIB -- a project scheduling problem library
- Probabilistic programming with discrete distributions and precedence constrained knapsack polyhedra
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Linear preselective policies for stochastic project scheduling
- Resource-constrained project scheduling: A survey of recent developments.
- On the generation of circuits and minimal forbidden sets
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- The construction of stable project baseline schedules
- Executing production schedules in the face of uncertainties: a review and some future directions
- Proactive policies for the stochastic resource-constrained project scheduling problem
- The project scheduling polyhedron: Dimension, facets and lifting theorems
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- Chance-Constrained Programming
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem
- Introduction to Stochastic Programming
- Resource allocation by means of project networks: Dominance results
- Resource allocation by means of project networks: Complexity results
- Solving Project Scheduling Problems by Minimum Cut Computations
- A Branch-and-Cut Algorithm for the Resolution of Large-Scale Symmetric Traveling Salesman Problems
- A Sample Approximation Approach for Optimization with Probabilistic Constraints
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- IRREVERSIBILITY AND HYSTERESIS FOR A FORWARD–BACKWARD DIFFUSION EQUATION
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm
This page was built for publication: A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations