The project scheduling polyhedron: Dimension, facets and lifting theorems
DOI10.1016/0377-2217(93)90062-RzbMATH Open0779.90036OpenAlexW2021200478MaRDI QIDQ2367366FDOQ2367366
Ramón Alvarez-Valdés Olaguíbel, José Manuel Tamarit Goerlich
Publication date: 25 August 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90062-r
inequalitiespolyhedronresource constraintsproject scheduling problemprecedence relationsfacet-defining properties
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35) Special polytopes (linear programming, centrally symmetric, etc.) (52B12)
Cites Work
- Maximal Flow Through a Network
- Scheduling subject to resource constraints: Classification and complexity
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm
- Lifting the facets of zero–one polytopes
- Technical Note—Facets and Strong Valid Inequalities for Integer Programs
- Technical Note—A Note on Zero-One Programming
- On the facial structure of scheduling polyhedra
Cited In (21)
- The Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approaches
- Integration of routing into a resource-constrained project scheduling problem
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- Branch-and-Cut-and-Price algorithms for the preemptive RCPSP
- Robust energy planning in buildings with energy and comfort costs
- Project scheduling with flexible resources: formulation and inequalities
- A stochastic bi-objective project scheduling model under failure of activities
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
- Towards merging binary integer programming techniques with genetic algorithms
- Event-based MILP models for resource-constrained project scheduling problems
- On the generation of circuits and minimal forbidden sets
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison
- Multi-mode resource constrained project scheduling problem along with contractor selection
- A preemptive bound for the resource constrained project scheduling problem
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- A polyhedral study of event-based models for the resource-constrained project scheduling problem
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- Continuous-time formulations for multi-mode project scheduling
- The proactive and reactive resource-constrained project scheduling problem
Recommendations
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements 👍 👎
- On the facial structure of scheduling polyhedra 👍 👎
- Title not available (Why is that?) 👍 👎
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation 👍 👎
This page was built for publication: The project scheduling polyhedron: Dimension, facets and lifting theorems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2367366)