Time slack-based techniques for robust project scheduling subject to resource uncertainty
From MaRDI portal
Publication:646671
DOI10.1007/s10479-010-0777-zzbMath1225.90062OpenAlexW2000553934MaRDI QIDQ646671
Olivier Lambrechts, Erik L. Demeulemeester, Willy S. Herroelen
Publication date: 17 November 2011
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-010-0777-z
Related Items (12)
A genetic algorithm for the robust resource leveling problem ⋮ A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ Predictive-reactive scheduling for single surgical suite subject to random emergency surgery ⋮ Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty ⋮ Tabu search for proactive project scheduling problem with flexible resources ⋮ Robust execution strategies for project scheduling with unreliable resources and stochastic durations ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ The impact of design uncertainty in engineer-to-order project planning ⋮ Joint planning of service engineers and spare parts ⋮ A fuzzy robustness measure for the scheduling of commissioned product development projects
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
- The generation of stable project plans
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The construction of stable project baseline schedules
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- Predictable scheduling of a single machine with breakdowns and sensitive jobs
This page was built for publication: Time slack-based techniques for robust project scheduling subject to resource uncertainty