Preselective strategies for the optimization of stochastic project networks under resource constraints
From MaRDI portal
(Redirected from Publication:4740322)
Cites work
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- scientific article; zbMATH DE number 3720658 (Why is no real title available?)
- scientific article; zbMATH DE number 3621504 (Why is no real title available?)
- scientific article; zbMATH DE number 3274494 (Why is no real title available?)
- Stochastic optimal control. The discrete time case
Cited in
(35)- Schedule-induced posets
- New strategies for stochastic resource-constrained project scheduling
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
- The preemptive stochastic resource-constrained project scheduling problem
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- On the generation of circuits and minimal forbidden sets
- Project scheduling under uncertainty: survey and research potentials
- Minimum-cost diagnostic strategies for \(k\)-out-of-\(n\) systems with imperfect tests
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Stochastic task networks -- trading performance for stability
- Considering project management activities for engineering design groups
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities
- Scheduling Markovian PERT networks to maximize the net present value
- The proactive and reactive resource-constrained project scheduling problem
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- A Boolean satisfiability approach to the resource-constrained project scheduling problem
- Project planning with alternative technologies in uncertain environments
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- Resource allocation by means of project networks: dominance results
- Resource allocation by means of project networks: complexity results
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Bi-objective multi-mode project scheduling under risk aversion
- Stochastic scheduling problems I — General strategies
- A pure proactive scheduling algorithm for multiple Earth observation satellites under uncertainties of clouds
- Stochastic scheduling problems II-set strategies-
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- Reactive scheduling of uncertain jobs with maximum time lags
- Surrogate-assisted cooperative learning genetic programming for the resource-constrained project scheduling problem with stochastic activity durations and transfer times
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- A classification of predictive-reactive project scheduling procedures
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
- Scheduling of project networks
This page was built for publication: Preselective strategies for the optimization of stochastic project networks under resource constraints