Modelling setup times, process batches and transfer batches using activity network logic
From MaRDI portal
Publication:1266699
DOI10.1016/0377-2217(94)00249-5zbMATH Open0913.90167OpenAlexW2004906095MaRDI QIDQ1266699FDOQ1266699
Authors: Erik Demeulemeester, Willy Herroelen
Publication date: 29 November 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00249-5
Recommendations
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Modelling setup times in project scheduling
- Modeling job shop scheduling with batches and setup times by timed Petri nets
- Modeling of period overlapping setup times
- scientific article; zbMATH DE number 4085404
production schedulingsequence-independent setup timesgeneralized resource-constrained project scheduling
Cites Work
Cited In (9)
- Resource-constrained project scheduling with activity splitting and setup times
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective
- Optimality conditions to the acyclic travelling salesman problem.
- Modelling setup times in project scheduling
- Optimizing the supply chain configuration for make-to-order manufacturing
- Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
- Extending the shifting bottleneck procedure to real-life applications
- Modeling job shop scheduling with batches and setup times by timed Petri nets
This page was built for publication: Modelling setup times, process batches and transfer batches using activity network logic