Modelling setup times, process batches and transfer batches using activity network logic
From MaRDI portal
Publication:1266699
DOI10.1016/0377-2217(94)00249-5zbMath0913.90167OpenAlexW2004906095MaRDI QIDQ1266699
Erik L. Demeulemeester, Willy S. Herroelen
Publication date: 29 November 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00249-5
production schedulingsequence-independent setup timesgeneralized resource-constrained project scheduling
Related Items (7)
Optimizing the supply chain configuration for make-to-order manufacturing ⋮ Study on constraint scheduling algorithm for job shop problems with multiple constraint machines ⋮ Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective ⋮ Optimality conditions to the acyclic travelling salesman problem. ⋮ Resource-constrained project scheduling with activity splitting and setup times ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Extending the shifting bottleneck procedure to real-life applications
Cites Work
This page was built for publication: Modelling setup times, process batches and transfer batches using activity network logic