Modelling setup times in project scheduling
From MaRDI portal
Publication:3426432
zbMATH Open1127.90033MaRDI QIDQ3426432FDOQ3426432
Marek Mika, Jan Węglarz, Grzegorz Waligóra
Publication date: 9 March 2007
Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Cited In (8)
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A flow-based tabu search algorithm for the RCPSP with transfer times
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- Managing and modelling general resource transfers in (multi-)project scheduling
- Local search approaches for the test laboratory scheduling problem with variable task grouping
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
- A local search framework for industrial test laboratory scheduling
Recommendations
- Survey of scheduling research involving setup times 👍 👎
- Modelling setup times, process batches and transfer batches using activity network logic 👍 👎
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times 👍 👎
- The third comprehensive survey on scheduling problems with setup times/costs 👍 👎
- Resource-constrained project scheduling: Notation, classification, models, and methods 👍 👎
This page was built for publication: Modelling setup times in project scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3426432)