A flow-based tabu search algorithm for the RCPSP with transfer times
From MaRDI portal
Publication:280159
DOI10.1007/S00291-015-0402-2zbMATH Open1339.90150OpenAlexW655022694MaRDI QIDQ280159FDOQ280159
Authors: Jens Poppenborg, Sigrid Knust
Publication date: 4 May 2016
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0402-2
Recommendations
- Formulation and tabu search algorithm for the resource constrained project scheduling problem.
- Tabu search for resource-constrained scheduling
- Algorithm for resource-constrained project scheduling problem with resource transfer time
- scientific article; zbMATH DE number 1488068
- A tabu search approach for the resource constrained project scheduling problem
Cites Work
- PSPLIB -- a project scheduling problem library
- Title not available (Why is that?)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Project scheduling. A research handbook.
- A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- List scheduling in a parallel machine environment with precedence constraints and setup times
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Managing and modelling general resource transfers in (multi-)project scheduling
- Modelling setup times in project scheduling
- Complex Scheduling
- Job Shop Scheduling by Simulated Annealing
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Title not available (Why is that?)
- Title not available (Why is that?)
- Scheduling the production of rolling ingots: industrial context, model, and solution method
- Title not available (Why is that?)
Cited In (10)
- Integration of routing into a resource-constrained project scheduling problem
- Editorial ``Project management and scheduling
- MIP-based solution approaches for multi-site resource-constrained project scheduling
- Algorithm for resource-constrained project scheduling problem with resource transfer time
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
- Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
- A tree search heuristic for the resource constrained project scheduling problem with transfer times
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
This page was built for publication: A flow-based tabu search algorithm for the RCPSP with transfer times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q280159)