A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
From MaRDI portal
Publication:1014947
DOI10.1016/j.ejor.2008.07.036zbMath1159.90461OpenAlexW2059117750MaRDI QIDQ1014947
Publication date: 30 April 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/receive/dbt_mods_00016225
Related Items (16)
A flow-based tabu search algorithm for the RCPSP with transfer times ⋮ Multi-mode resource constrained multi-project scheduling and resource portfolio problem ⋮ Managing and modelling general resource transfers in (multi-)project scheduling ⋮ Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers ⋮ Integration of routing into a resource-constrained project scheduling problem ⋮ An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case ⋮ Integrated multi-project planning and scheduling -- a multiagent approach ⋮ A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times ⋮ Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ Resource-constrained project scheduling with activity splitting and setup times ⋮ Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times ⋮ A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing ⋮ An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers ⋮ A tree search heuristic for the resource constrained project scheduling problem with transfer times ⋮ Workforce routing and scheduling for electricity network maintenance with downtime minimization
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Audit scheduling with overlapping activities and sequence-dependent setup costs
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
- Optimization analysis for design and planning of multi-project programs
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
- Project scheduling. A research handbook.
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of resource-constrained projects
- Scattered branch and bound. An adaptive search strategy applied to resource-constrained project scheduling
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Managing and modelling general resource transfers in (multi-)project scheduling
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
This page was built for publication: A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times