A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times

From MaRDI portal
Publication:1014947

DOI10.1016/j.ejor.2008.07.036zbMath1159.90461OpenAlexW2059117750MaRDI QIDQ1014947

Doreen Krüger, Armin Scholl

Publication date: 30 April 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://www.db-thueringen.de/receive/dbt_mods_00016225




Related Items (16)

A flow-based tabu search algorithm for the RCPSP with transfer timesMulti-mode resource constrained multi-project scheduling and resource portfolio problemManaging and modelling general resource transfers in (multi-)project schedulingModeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfersIntegration of routing into a resource-constrained project scheduling problemAn efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode caseIntegrated multi-project planning and scheduling -- a multiagent approachA branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer timesMulti-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due datesResource-constrained multi-project scheduling problem: a surveyResource-constrained project scheduling with activity splitting and setup timesResource Constrained Multi-Project Scheduling Problem with Resource Transfer TimesA column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharingAn efficient genetic algorithm for decentralized multi-project scheduling with resource transfersA tree search heuristic for the resource constrained project scheduling problem with transfer timesWorkforce routing and scheduling for electricity network maintenance with downtime minimization


Uses Software


Cites Work


This page was built for publication: A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times