An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
DOI10.3934/jimo.2020140zbMath1499.90086OpenAlexW3087231084MaRDI QIDQ2076410
Wanjun Liu, Jingwen Zhang, Wanlin Liu
Publication date: 16 February 2022
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2020140
genetic algorithmdecentralized multi-project schedulingresource transfer rulesresource transfer timesscheduling generation schemes
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Uses Software
Cites Work
- Unnamed Item
- A flow-based tabu search algorithm for the RCPSP with transfer times
- An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling
- Scheduling of multiple projects with resource transfers
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Activity list representation for a generalization of the resource-constrained project scheduling problem
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Justification and RCPSP: a technique that pays
- Managing and modelling general resource transfers in (multi-)project scheduling
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- A market-based multi-agent system model for decentralized multi-project scheduling
- Modeling industrial lot sizing problems: a review
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
This page was built for publication: An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers