A market-based multi-agent system model for decentralized multi-project scheduling
From MaRDI portal
Publication:2480205
DOI10.1007/s10479-006-0158-9zbMath1144.90377OpenAlexW1964219488MaRDI QIDQ2480205
Silvia Rismondo, Stefano Giordani, Giuseppe Confessore
Publication date: 31 March 2008
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-006-0158-9
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (22)
A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource ⋮ Design of automated negotiation mechanisms for decentralized heterogeneous machine scheduling ⋮ New summary measures and datasets for the multi-project scheduling problem ⋮ Integrated multi-project planning and scheduling -- a multiagent approach ⋮ Resource constraint scheduling with a fractional shared resource ⋮ Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty ⋮ Decentralised scheduling with confidentiality protection ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff ⋮ A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling ⋮ Multi-project scheduling with two-stage decomposition ⋮ Negotiation mechanisms for the multi-agent multi-mode resource investment problem ⋮ Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem ⋮ Nash equilibria for the multi-agent project scheduling problem with controllable processing times ⋮ A learning-based optimization approach to multi-project scheduling ⋮ A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem ⋮ Revenue sharing for resource transfer among projects ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Nash equilibrium solutions in multi-agent project scheduling with milestones ⋮ Price of anarchy and price of stability in multi-agent project scheduling ⋮ An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
Uses Software
Cites Work
- Auctions with a stochastic number of bidders
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Computationally Manageable Combinational Auctions
- CABOB: A Fast Optimal Algorithm for Winner Determination in Combinatorial Auctions
- Scheduling Problems with Two Competing Agents
- Auction protocols for decentralized scheduling
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
- Two-machine flow shops with limited machine availability
This page was built for publication: A market-based multi-agent system model for decentralized multi-project scheduling