On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints

From MaRDI portal
Publication:3114719

DOI10.1287/mnsc.47.8.1113.10226zbMath1232.90215OpenAlexW2074986265MaRDI QIDQ3114719

Mario Vanhoucke, Willy S. Herroelen, Erik L. Demeulemeester

Publication date: 19 February 2012

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.47.8.1113.10226




Related Items (22)

An exact algorithm for an integrated project staffing problem with a homogeneous workforceA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsThe discrete time/cost trade-off problem: Extensions and heuristic proceduresOptimization Strategies for Resource-Constrained Project Scheduling Problems in Underground MiningKnowledge integration using problem spaces: A study in resource-constrained project schedulingAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsAn agency perspective for multi-mode project scheduling with time/cost trade-offsConsidering project management activities for engineering design groupsThe bilevel optimisation of a multi-agent project scheduling and staffing problemCapital- and resource-constrained project scheduling with net present value optimizationGeneric negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problemsMoments and distribution of the net present value of a serial projectMulti-mode project payment scheduling problems with bonus-penalty structureSimulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment modelsA column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharingA survey of variants and extensions of the resource-constrained project scheduling problemCP methods for scheduling and routing with~time-dependent task costsClient‐contractor bargaining on net present value in project scheduling with limited resourcesProject selection, scheduling and resource allocation with time dependent returnsProgress payments in project scheduling problems.Simulated annealing and tabu search for multi-mode project payment scheduling


Uses Software



This page was built for publication: On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints