On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
From MaRDI portal
Publication:3114719
DOI10.1287/mnsc.47.8.1113.10226zbMath1232.90215OpenAlexW2074986265MaRDI QIDQ3114719
Mario Vanhoucke, Willy S. Herroelen, Erik L. Demeulemeester
Publication date: 19 February 2012
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.47.8.1113.10226
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Related Items (22)
An exact algorithm for an integrated project staffing problem with a homogeneous workforce ⋮ A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows ⋮ The discrete time/cost trade-off problem: Extensions and heuristic procedures ⋮ Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining ⋮ Knowledge integration using problem spaces: A study in resource-constrained project scheduling ⋮ An analysis of network and resource indicators for resource-constrained project scheduling problem instances ⋮ New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms ⋮ An agency perspective for multi-mode project scheduling with time/cost trade-offs ⋮ Considering project management activities for engineering design groups ⋮ The bilevel optimisation of a multi-agent project scheduling and staffing problem ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems ⋮ Moments and distribution of the net present value of a serial project ⋮ Multi-mode project payment scheduling problems with bonus-penalty structure ⋮ Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models ⋮ A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ CP methods for scheduling and routing with~time-dependent task costs ⋮ Client‐contractor bargaining on net present value in project scheduling with limited resources ⋮ Project selection, scheduling and resource allocation with time dependent returns ⋮ Progress payments in project scheduling problems. ⋮ Simulated annealing and tabu search for multi-mode project payment scheduling
Uses Software
This page was built for publication: On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints