A float-path theory and its application to the time-cost tradeoff problem
From MaRDI portal
(Redirected from Publication:305477)
Recommendations
Cites work
- scientific article; zbMATH DE number 4172725 (Why is no real title available?)
- scientific article; zbMATH DE number 3661085 (Why is no real title available?)
- A CPM Time-Cost Computational Algorithm for Arbitrary Activity Cost Functions
- A network flow computation for project cost curves
- A note on time/cost tradeoff curve generation for project scheduling with multi-mode resource availability costs
- Activity nets: A guided tour through some recent developments
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
- Approximation algorithms for the discrete time-cost tradeoff problem
- Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- Critical Path Problems with Concave Cost-Time Curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
- Fully polynomial-time approximation schemes for time-cost tradeoff problems in series-parallel project networks
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- New computational results for the discrete time/cost trade-off problem with time-switch constraints
- Optimum Time Compression in Project Scheduling
- Project scheduling. A research handbook.
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
- The discrete time-cost tradeoff problem revisited
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
Cited in
(4)
This page was built for publication: A float-path theory and its application to the time-cost tradeoff problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q305477)