Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations
DOI10.1080/10556788.2015.1005838zbMath1336.90084OpenAlexW2079781434WikidataQ122450666 ScholiaQ122450666MaRDI QIDQ3458826
Francisco J. Santos-Arteaga, Kaveh Khalili-Damghani, Amir-Reza Abtahi, Madjid Tavana
Publication date: 28 December 2015
Published in: Optimization Methods and Software (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/10556788.2015.1005838
particle swarm optimizationgeneralized precedence relationsefficient epsilon-constraint methodpartial bound enumeration algorithmtime-cost-quality trade-off
Mixed integer programming (90C11) Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Cites Work
- A fuzzy multidimensional multiple-choice knapsack model for project portfolio selection using an evolutionary algorithm
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
- On the discrete time, cost and quality trade-off problem
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- The discrete time-cost tradeoff problem revisited
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Project management with time, cost, and quality considerations
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Lower bounds for resource-constrained project scheduling problems.
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Project scheduling under uncertainty: survey and research potentials
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- An integrated multi-objective framework for solving multi-period project selection problems
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
- Multi-objective particle swarm optimization with time variant inertia and acceleration coefficients
- Rangen: A random network generator for activity-on-the-node networks
- New computational results on the discrete time/cost trade-off problem in project networks
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- Introduction to Evolutionary Algorithms
This page was built for publication: Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations