Activity Delay in Stochastic Project Networks
From MaRDI portal
Publication:4367270
Recommendations
- Scheduling projects with stochastic activity duration to maximize expected net present value
- A surrogate indicator of criticality for stochastic project networks
- An optimization model for stochastic project networks with cash flows
- On the optimal management of project risk
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
Cited in
(25)- The preemptive stochastic resource-constrained project scheduling problem
- Predetermined intervals for start times of activities in the stochastic project scheduling problem
- New strategies for stochastic resource-constrained project scheduling
- Mapping distinctive competencies: a systemic approach
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Improving project cost estimation by taking into account managerial flexibility
- Designing practical coordinating contracts in decentralized projects
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology
- A surrogate indicator of criticality for stochastic project networks
- Scheduling Markovian PERT networks to maximize the net present value
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Computing project makespan distributions: Markovian PERT networks revisited
- Maximizing the net present value of a project under uncertainty: activity delays and dynamic policies
- Sharing delay costs in stochastic scheduling problems with delays
- Maximizing the net present value of a project under uncertainty
- Some remarks on the expected delay of project duration in a PERT network
- Maximizing the expected net present value in a project with uncertain cash flows
- Stochastic project networks. Temporal analysis, scheduling and cost minimization
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology
- Scheduling Markovian PERT networks to maximize the net present value: new results
- Seeking optimum project duration extensions
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- An optimization model for stochastic project networks with cash flows
- Project planning with alternative technologies in uncertain environments
- Scheduling projects with stochastic activity duration to maximize expected net present value
This page was built for publication: Activity Delay in Stochastic Project Networks